Challenge - Inaccessible areas required cleaning to maintain good levels of hygiene

A large NHS rehabilitation centre required deep cleaning of its on-site facilities. The facility features complex medical wings, highlighting the importance of hygiene, but there were also several challenges to be considered:

  • Inaccessible heights: The gym ceilings were too high to reach with standard cleaning methods. Over time, this had led to a significant build-up of dust. 
  • Stringent security processes: The facility maintains a high level of security and requires strict vetting for anyone working on site.
  • Expansive areas: The customer required disinfection of its large on-site gym and an Olympic-size pool.
  • Tight deadlines: The facility shuts down for only one week each year, providing a seven-day deadline to complete the cleaning.
Clinic

Solution: The Experts in Hygiene

Utilising the appropriate PPE and specialist equipment, our RSPH-accredited technicians implemented a rigorous decontamination plan tailored to the needs of the site:

Specialist Rope Access Equipment: To tackle the extreme heights above the pool and gym halls, rope access equipment was utilised. This allowed the team to safely clean areas that were otherwise inaccessible.

Innovative Disinfection Methods: The gym and pool halls received in-depth disinfection. Our teams deployed UV disinfection methods to thoroughly and effectively reach large surface areas.

Outcome: Clinical Hygiene Standards Maintained

Our teams at Rentokil Specialist Hygiene are experienced in operating within high-security environments and ensured the project was completed on time with no security breaches or delays.

The customer was extremely satisfied with the results and gave positive feedback on our ability to meet the facility’s complex requirements. By completing the project within the strict seven-day shutdown, we ensured the site was fully operational and clinically safe.

Whilst on-site, our teams identified and removed high volumes of dust build-up. They also provided recommendations for air ventilation cleaning to prevent dust and debris from entering the pool. This meant the customer was provided with a plan to maintain high levels of hygiene.